Charles River Laboratories Addition 

Location: Charleston, SC
Project Completion Date: November, 2023
Total Project Value: $126,138.00


This design-build project consisted of the design and construction of a small pre-engineered metal building lean-to structure to house air compressor equipment. The project features site demolition, concrete foundations, a pre-engineered metal building, electrical service upgrade, and overhead door. 

Previous
Previous

The Citadel Fire Pump and Water Tank Replacement

Next
Next

Trident Technical College – Greenhouse Replacement