Trident Technical College – Greenhouse Replacement
Location: North Charleston, SC
Project Completion Date: October, 2023
Total Project Value: $572,148.20
SCOPE OF WORK:
This design-bid-build project consisted of demolishing two existing greenhouses and the construction of two new greenhouses in the same footprint. The project featured concrete foundations, pre-engineered greenhouses, electrical, plumbing, and HVAC. The greenhouses featured gas fire heaters, sidewall fans, evaporative coolers, motor driven sidewall and roof vents, and shade curtains.